Frequency Plastic Welding Machines proper use of the sequence of operations:
1. Connected to the three-phase power switch, and then turn the power switch on the machine side of the control box, if there is high cycle switch temporarily marked, and then marked with the electric power switch at this time, vacuum tubes and hot mode are beginning to pre-heat.
2. The next mode auxiliary insulation on the extreme loading mode, the test mode switch is pressed to start debugging the upper and lower die bonding position, if the next junction adverse mobile mode, if the level is substandard, you tune compared to the previous mode pillars of the child.
3. Fine mold, adjust the three time controller (if it is the foot type of machine, only high cycle welding time), fall time on the mold run to compress the time of the lower die, the welding time, output time, cooling time curing time, be flexible application of the above three hours, no fixed number of values.
4. If the first transfer mode, the same tune tuner tune the spacing will be transferred to the widest.
5. The above operation has been more than 10-15 minutes, and temperature to achieve the required high-cycle switch marked the commencement of operation of the test.
6. Test, if the result is not ideal, slowly add the cohomology, watching the screen flow sheet (different models of the table values, please refer to the instructions). Check it out, if not ideal, put the same modem add a little or down a bit, until it reaches the requirements.
7. The effect of the finished product, determined by the following four aspects: Temperature, H.F. Output, Pressure and H.F.'s Time. The above four areas, the flexibility to adjust.